Free templates, checklists & worksheets — Greenbox Design Studio
Free Resources

Free templates, checklists & worksheets

The nine working documents we use internally, cleaned up and given away — because a client who arrives prepared gets a better project.

4.9/5 · 127 Client ratings
Updated 19 Sep 2026
✓ Warranty-backed work✓ On-time completion guarantee✓ Design & build under one roof✓ 250+ projects delivered

What is in the pack

These are not marketing brochures. Each one is a working document we use internally, edited so that it makes sense to someone outside the studio.

The Greenbox template pack
DocumentFormatWhat it doesUse it when
BOQ comparison sheetSpreadsheet, 3 tabsNormalises two or three quotations onto one page: carcass grade, hardware brand, finish, quantity, inclusions and exclusions side by side, with an automatic per-sq-ft calculation from your carpet areaYou have quotations from more than one studio and they do not look comparable
Society NOC packPDF, 6 pagesA model NOC application letter, a worker list template, a structural undertaking, and a one-page schedule of hours, deposits and debris routes for your committee to signBefore you book a start date on any Mumbai society project
Snag list templateSpreadsheet, room-wiseA room-by-room defect schedule with severity, responsibility, photo reference and a closed-on date, laid out so it can be signed off in a single walkIn the last two weeks of any project, before handover
Electrical & data scheduleSpreadsheet, room-wiseEvery socket, switch, light point, data point and AC point by room and by wall, with heights, so first fix is agreed on paper rather than shouted across a siteBefore first fix begins — this is the one that saves the most money
Storage audit worksheetPDF, 4 pagesA room-by-room count of what you actually own, converted into cubic feet, so wardrobe and kitchen volume is designed against reality rather than a guessAt the start of design, especially on a redevelopment or possession flat
Kitchen brief sheetPDF, 2 pagesCooking frequency, number of people cooked for, appliance list with dimensions, storage preferences and the non-negotiables, in the order a designer needs themBefore your first kitchen design meeting
Payment milestone trackerSpreadsheetThe five standard milestones with the verification evidence required at each, so you release money against progress rather than against a dateFrom contract signature through to final payment
Office fit-out readiness checklistPDF, 5 pagesLandlord fit-out manual items, drawing approval status, nominated vendor packages, insurance certificates, lift and dock policy, night-work permit and headcount assumptionsBefore signing a commercial fit-out contract
Handover document checklistPDF, 2 pagesEverything you should receive at handover: warranty documents, material and brand schedule, appliance manuals, closed snag list, maintenance guidance and as-built electrical layoutIn the final week, so nothing is missing after the team has left

The three that matter most

If you only take three, take these.

BOQ comparison sheet

Most clients cannot compare quotations because they are not quoting the same thing. This sheet forces each one onto the same line items and exposes the differences — usually carcass grade, hardware brand and what has quietly been excluded. It is the single most useful hour you will spend before signing.

Electrical & data schedule

Nearly every post-handover regret is an electrical one: no socket by the bed, no data point in the study, a switch behind a door. Filling this in room by room before first fix costs an evening and prevents a class of problem that is genuinely expensive to fix later.

Storage audit worksheet

Storage designed against a guess always disappoints. Counting what you own — in cubic feet, room by room — is unglamorous and it is the reason the storage-led projects in our portfolio worked. It also tells you honestly how much of what you own should not be moving house with you.

Design and build under one accountable roof — Greenbox Design Studio
Free Resources

Design and build under one accountable roof

How to get them

  1. Ask by WhatsApp or the form on this page. Tell us which documents you want, or just ask for the whole pack.
  2. We send them the same working day, as one PDF plus editable spreadsheets.
  3. No sales call is attached. If you want to talk about a project, say so and we will call. If you do not, you will not hear from us beyond the email that carries the files.
  4. Use them with anyone. These are not Greenbox-specific documents. Use the BOQ comparison sheet on our quotation as readily as on anyone else's — we would rather be compared properly than not compared at all.

Guides that go with the templates

9Documents in the pack
Same dayDelivery
FreeNo obligation
EditableSpreadsheets included

Everything in this section

All 100 free downloads pages:

Greenbox residential interior project in Mumbai — 1
Greenbox residential interior project in Mumbai — 2
Greenbox residential interior project in Mumbai — 3
Greenbox residential interior project in Mumbai — 4
Greenbox residential interior project in Mumbai — 5

Selected work by Greenbox Design Studio. Tap any image to enlarge.

Frequently asked questions

Are the templates really free?+

Yes, and there is no sales call attached. Ask by WhatsApp or through the form and we send the pack the same working day as one PDF plus editable spreadsheets. If you want to discuss a project you have to tell us so; we do not follow up on a download request.

Can I use the BOQ comparison sheet on quotations from other studios?+

That is what it is for. It normalises two or three quotations onto the same line items — carcass grade, hardware brand, finish, quantities, inclusions and exclusions — and calculates a per-sq-ft figure from your carpet area. Use it on ours as readily as on anyone else's.

Which template should I fill in first?+

The electrical and data schedule, if your project has started. Sockets, switches, light points, data points and AC points fixed on paper before first fix is the cheapest problem-prevention available on an interior project. If you are still choosing a studio, start with the BOQ comparison sheet instead.

Do the templates work for commercial projects?+

The office fit-out readiness checklist, the snag list and the payment milestone tracker do. The others are residential in focus. For a commercial project the readiness checklist is the important one — it covers the landlord fit-out manual, drawing approvals, nominated vendor packages and night-work permits before you sign.

Will you send me marketing emails afterwards?+

No. Your address is used to send the files and nothing else unless you ask to be contacted about a project. We would rather the templates circulate freely than be a lead-capture mechanism — a client who arrives having filled in a storage audit is worth more to us than a mailing list entry.