Twenty-two rows covering every inlet and outlet in a flat, with the height each one sits at and the check before plaster.

4.9/5 · 127 Client ratings
Updated 19 Sep 2026
✓ Warranty-backed work✓ On-time completion guarantee✓ Design & build under one roof✓ 250+ projects delivered

The complete plumbing schedule

The whole table is below. Confirm each row against the fixture you have actually purchased rather than against a generic default.

Plumbing point schedule — inlets, outlets and heights
LocationPointLineSizeHeight above floorCheck before closing the wall
Kitchen sinkCold inletCold15 mm18–20 inClear of the drawer box behind the sink cabinet
Kitchen sinkHot inletHot15 mm18–20 inOnly if a geyser serves the kitchen; insulate the run
Kitchen sinkWasteDrain40 mmBelow counterDeep-seal trap with an accessible clean-out
KitchenWater purifierCold15 mm24 inInlet and a drain point; do not run the drain to the sink bowl
KitchenDishwasherCold15 mm18 inInlet, drain and 16A socket in the same bay
UtilityWashing machineCold15 mm36 inBib cock with a hose union and a floor trap within 3 ft
UtilityFloor trapDrain75 mmFloorFall towards the trap checked with water, not by eye
Master bathWC inletCold15 mm8–10 inAngle valve position matched to the WC model
Master bathWC waste (S or P trap)Soil110 mmPer fixtureRough-in distance confirmed against the actual WC
Master bathHealth faucetCold15 mm18–24 inReachable seated, on the dominant-hand side
Master bathWash basin inletHot + cold15 mm22–24 inBehind the vanity, clear of the drawer carcass
Master bathBasin wasteDrain32–40 mm16–18 inBottle trap chosen if the vanity is open below
Master bathShower mixerHot + cold15 mm42–48 inCentred on the shower zone, not on the tile joint
Master bathOverhead shower arm-15 mm80–84 inSet to the tallest user; check against the false ceiling
Master bathHand shower outlet-15 mm48 inDiverter direction confirmed before tiling
Master bathGeyser inlet and outletHot + cold15 mm72–78 inOutside the direct spray zone; dedicated 16A point
Master bathFloor trapDrain75 mmFloor1 in 80 fall to the trap across the whole floor
Common bathWC, basin, health faucetMixed15 / 110 mmAs aboveConfirm the shorter rough-in used in older buildings
Common bathWall-mixer with bath spoutHot + cold15 mm30 inSpout 6 in above the bucket line, not above a tile edge
BalconyBib cock and drainCold15 / 75 mm24 inDrain to the shaft, never into the flat below's chhajja
Whole flatMain shut-off valveCold25 mmAccessibleOne valve per bathroom plus a flat-level isolation valve
Whole flatPressure test---24-hour test at 1.5 times working pressure before plaster

Heights are above finished floor level. Confirm rough-in distances against the model of WC and basin you have bought.

How to run it before the wall closes

  1. Buy the sanitaryware first. A WC rough-in set to a generic distance and a pan bought later rarely agree.
  2. Pressure test for 24 hours at 1.5 times working pressure and get the result recorded before any plaster goes on.
  3. Photograph every chased wall before plastering and keep the images with your as-built drawings.
  4. Check reach, not just height. Sit on the WC and put your hand where the health faucet will be; 18 to 24 inches on the dominant-hand side is not a formality.

What it prevents

  • A vanity you cannot install because the inlet lands inside the drawer box.
  • A shower mixer centred on a tile joint rather than on the shower zone.
  • A washing machine with no floor trap within reach, which means a hose across the utility floor for the next ten years.

Download the schedule (PDF) →

See how the sequence fits together in the bathroom renovation guide, or price it on the bathroom cost page.

Frequently asked questions

CPVC, composite or copper?+

CPVC is the Mumbai default for hot and cold and performs well when the jointing is done properly. Composite pipe is more forgiving of movement and costs more. Copper is rare in residential work now and is mostly seen in older buildings and in some commercial hot-water applications.

What is the right fall for a drain line?+

1 in 60 for waste lines and 1 in 80 across a bathroom floor to the trap. Steeper is not better on a soil line — water outruns solids and the line blocks. Check the floor fall with water rather than a level, because a level will not show you a hollow.

Where should the geyser go?+

Above the door or on the wall away from the direct spray zone, at 72 to 78 inches, with its own 16A point and MCB. Keep the inlet and outlet accessible; a geyser boxed into a false ceiling with no access panel has to be demolished to be serviced.

Can I move a WC in a Mumbai flat?+

Within a sunk slab, usually yes, by up to two or three feet using the sunk depth. In a non-sunk bathroom the drain runs in the slab below, which is your neighbour's ceiling, so the options are a floor-mounted P-trap, a macerator or a raised platform. None is free, and all need society consent.

Should I replace concealed plumbing in a renovation?+

In a building over 25 years old, yes. Concealed galvanised iron lines from that era are usually scaled and leaking at the joints. Replacing them while the wall is already open costs a fraction of doing it as an emergency two years later.