Modular kitchen & wardrobe services — Greenbox Design Studio
Service Hub

Modular kitchen & wardrobe services

Two disciplines that share a factory, a carcass standard and a hardware list — and differ in almost everything else.

4.9/5 · 127 Client ratings
Updated 19 Sep 2026
✓ Warranty-backed work✓ On-time completion guarantee✓ Design & build under one roof✓ 250+ projects delivered

What sits under this hub

This page is a map. Each child page below owns its own subject in depth; use the table to get to the right one rather than reading all six.

Kitchen and wardrobe pages — what each one owns
If you want to…ReadWhat it covers
Understand kitchen design itself — layouts, ergonomics, materialsModular kitchen designThe discipline: layouts, the work triangle, storage strategy, finishes
Hire a kitchen team in MumbaiModular kitchen designers in MumbaiMumbai rates, society constraints, suburb variation, local proof
Know what a kitchen costsModular kitchen costNational ranges by size, finish and hardware tier
Understand wardrobe designWardrobe designInternal planning, hinged versus sliding, lofts, dressing units
Hire a wardrobe team in MumbaiWardrobe designers in MumbaiMumbai rates and the storage-engineering brief that dominates here
Know what a wardrobe costsWardrobe costCost per running foot and per square foot by finish and hardware

Calculators for this cluster

Design and build under one accountable roof — Greenbox Design Studio
Service Hub

Design and build under one accountable roof

The specification standard, shared by both

Whatever the finish, the hidden part of the work is identical across the cluster. This is the standard we quote from, and it is the part of a comparison most quotations obscure.

Shared carcass and hardware standard
ComponentOur standardWhy it is not negotiable
Carcass710-grade BWP plywood, 18 mm, fully edge-banded including hidden edgesThe only component that cannot be replaced without dismantling the installation
Back panel6 mm BWP, grooved in, not stapled onA stapled back panel is what makes a wardrobe rack over time
HingesHettich or Ebco soft-close, 110° or 165° as the layout needsHinges carry the shutter weight for fifteen years
Drawer runnersFull-extension soft-close runners, not roller channelsRoller channels seize in Mumbai humidity and cannot reach the back of the drawer
Shutter edge0.8 mm or 2 mm PVC banding, machine-appliedHand-applied banding lifts at the corners within two monsoons
Hafele or Blum upgradesOffered on premium and luxury tiers, quoted as a named lineYou should be able to see exactly what the upgrade costs

Where the two disciplines diverge

Kitchen versus wardrobe — the practical differences
Modular kitchenWardrobe
Governing problemServices, heat and the work triangleVolume, reach and circulation
Critical dimensionCounter height and the triangle legsDepth (600 mm hanging) and shutter swing clearance
Wet exposureConstant — sink, dishwasher, steamOccasional — only where a wardrobe backs a bathroom wall
LightingThree circuits including under-cabinet task lightInterior lighting in tall and dressing units
Most valuable upgradeCorner recovery — magic corner or carouselFull-height with a loft rather than stopping at 2.1 m
Most common mistakeDeep base cupboards instead of drawersHinged shutters where circulation is under 900 mm
Typical install time3 – 5 days on site2 – 4 days on site

How a cluster project runs

  1. Survey and measureExact site dimensions, service positions, lift car dimensions and shutter swing clearances. Factory modules are cut to the site, not to the drawing.
  2. Layout and internal planningFor a kitchen, the triangle and the corner strategy. For a wardrobe, the internal split between hanging, shelving and drawers, based on what you actually own.
  3. Finish and hardware selectionSamples seen under the light in your own home. Hardware tier chosen as a named line so you can see what the upgrade buys.
  4. Factory productionFour to five weeks. Carcasses, shutters and edge banding are machine-made; site carpentry is limited to installation and scribing.
  5. InstallationThree to five days for a kitchen, two to four for a wardrobe run, plus a day for countertop templating and fitting where stone is involved.
  6. HandoverAlignment and soft-close adjustment, a hardware and brand schedule, and maintenance guidance.

Taking one of these on its own

Both are legitimate standalone projects and we take them regularly. A kitchen replacement in an occupied home runs three to five days of disruption after the old kitchen comes out, with the factory work done before anything is dismantled. A wardrobe run is quieter still. Clients frequently use one of these as a way to see how a studio behaves before committing to a full home, which is a sensible thing to do.

BWPCarcass standard
4–5 wksFactory lead time
3–5 daysKitchen installation
15+ yrsExpected carcass life
Greenbox residential interior project in Mumbai — 1
Greenbox residential interior project in Mumbai — 2
Greenbox residential interior project in Mumbai — 3
Greenbox residential interior project in Mumbai — 4
Greenbox residential interior project in Mumbai — 5

Selected work by Greenbox Design Studio. Tap any image to enlarge.

Frequently asked questions

Can I have just a kitchen or just wardrobes done?+

Yes, both are standalone projects we take regularly. Factory production happens before anything is dismantled, so on-site disruption is three to five days for a kitchen and two to four for a wardrobe run. Many clients use a single-element project to test a studio before committing to a full home.

What is the difference between modular and site-made carpentry?+

Modular means the carcasses, shutters and edge banding are machine-made in a factory to measured dimensions, then installed. Site carpentry means the same work is cut and assembled in your flat. Modular gives better edge sealing, squarer boxes and far less dust and time on site; site carpentry gives more freedom on odd dimensions.

How long does the factory take?+

Four to five weeks from final measurement and approved cutting list to delivery, for both kitchens and wardrobes. That runs in parallel with any civil or electrical work, so it rarely sits on the critical path of a full-home project — but on a standalone kitchen it is the bulk of the wait.

Do you use the same hardware in kitchens and wardrobes?+

The same standard — Hettich or Ebco soft-close hinges and full-extension runners, with Hafele or Blum offered as a named upgrade line. The specific items differ: kitchens need lift-up flap stays, tandem boxes and corner mechanisms, wardrobes need sliding gear, pull-down hanging rails and loft hardware.

What should I spend more on — the kitchen or the wardrobes?+

The kitchen, if you have to choose. It takes more abuse, involves water and heat, and its hardware cycles many more times a day. A kitchen at premium specification with wardrobes at essential is a more durable allocation than the reverse, and it is what we recommend when a budget will not stretch to both.

Related pages

Start your project

Let's design a space worth coming home to.

Free consultation, transparent pricing, and a team that handles design and execution end to end.

📞 CallFree Quote