Electrical Planning for Interiors — Greenbox Design Studio
Electrical

Electrical Planning for Interiors

The electrical layout is signed off in an hour and lived with for fifteen years. It deserves an afternoon.

4.9/5 · 127 Client ratings
Updated 19 Sep 2026
✓ Warranty-backed work✓ On-time completion guarantee✓ Design & build under one roof✓ 250+ projects delivered

Sequence: why this happens before plaster

Electrical is a first-fix trade. Conduits are chased into walls, wires are pulled, and then the wall is closed with plaster and never opened again without damage. That means every socket, switch, light and data point has to be decided while the layout is still on paper. The trigger for doing it is the frozen furniture plan: you cannot place a bedside socket until you know which side the bed's head is on, and you cannot place the TV points until you know whether the unit is wall-hung or floor-standing.

What one extra socket costs at each stage of the job
When the point is decidedCost to add oneDisruption
At layout stage, on the drawing₹450–₹900None
During conduiting, before wiring₹700–₹1,400Half a day
After wiring, before plaster₹1,100–₹2,200One day
After plastering₹1,800–₹4,5002–3 days, visible patch
After painting and handover₹3,500–₹9,000Surface conduit or a re-paint of the wall

Room-by-room point checklist

Point schedule for a typical 900–1,050 sq ft 2BHK
Room6 A sockets16 ASwitch pointsData / otherTotal
Living room82 (AC, TV zone)51 RJ45, 1 TV, 1 doorbell17
Master bedroom72 (AC, geyser spur)51 RJ4515
Second bedroom61 (AC)41 RJ4512
Kitchen83 (hob, oven, microwave)41 chimney point16
Bathroom x22 each1 each (geyser)2 each1 exhaust each12
Passage / foyer2—31 video door phone6
Utility / balcony21 (washing machine)2—5

Total 83 including bathrooms and utility; a lean but adequate scheme lands at 52–68. Builder provision is usually 34–42.

Design and build under one accountable roof — Greenbox Design Studio
Electrical

Design and build under one accountable roof

Heights — the detail that decides whether it is usable

Standard builder practice puts sockets at 300 mm and switches at 1200 mm everywhere, which is convenient for the electrician and wrong for about half the rooms. Set heights against the furniture.

  • Kitchen counter sockets: 1050–1150 mm from floor, i.e. 150–250 mm above a 900 mm counter, clear of the backsplash joint.
  • Bedside: 600 mm from floor if the socket sits behind a side table, or 750 mm if it is above the headboard line. Two sockets and a USB-C outlet each side.
  • Desk: 850–900 mm, i.e. just above the worktop, never below it.
  • Wall-hung TV: 1150–1250 mm, positioned behind the panel and offset 200 mm from the bracket plate so the plug fits.
  • Floor-standing TV unit: 250 mm, behind the unit, with a 60 mm grommet in the back panel.
  • Washing machine: 1100 mm, above the machine height, never behind it.
  • Switches: 1200 mm is fine generally; 900 mm is better in a children's room.
  • Geyser isolator: outside the shower zone, 1800 mm, with an indicator.

Circuits and load

A 2BHK drawing 6–8 kW needs its load split properly, not stacked on three MCBs. The failure mode of an under-circuited flat is not dramatic — it is a kitchen MCB that trips every time the microwave and the induction hob run together, for fifteen years.

Circuit schedule for a 2BHK at 6–8 kW connected load
CircuitRatingCableServes
Lighting, general6 A MCB1.5 sq mmAll ceiling and cove lighting, two circuits in a 2BHK
Power, general16 A MCB2.5 sq mm6 A socket rings, split by zone
Kitchen power20 A MCB, dedicated4 sq mmHob, oven, microwave, chimney
AC, per unit20 A MCB each4 sq mmOne circuit per indoor unit
Geyser, per bathroom16 A MCB each2.5 sq mmWith an isolator switch outside the wet zone
Washing machine16 A MCB2.5 sq mmDedicated; motors trip shared circuits
Whole flat40–63 A RCCB, 30 mA—Earth-leakage protection; test button pressed quarterly

Havells, Legrand, Schneider and ABB are all acceptable. What matters more is the RCCB actually being there and the earth being tested.

The ten points people wish they had added

  1. A socket inside the wardrobe — for a robot vacuum dock or an iron.
  2. Two sockets in the passage, for cleaning and for festival lighting.
  3. A 16 A point in the utility for a dishwasher you will buy later.
  4. A socket near the entrance door at 400 mm, for the shoe-cabinet light and a phone charger.
  5. A ceiling point in the balcony, switched from inside.
  6. A spare 25 mm conduit with a draw string from the TV wall to the equipment niche.
  7. One RJ45 per bedroom, even in a Wi-Fi house.
  8. A switched socket above the fridge, so the fridge is never on an extension.
  9. Two-way switching on the bedroom light, at the door and at the bed.
  10. A dedicated point for the inverter or UPS, near the DB rather than in a corner.
52–68points in a properly planned 2BHK
34–42points a builder typically provides
₹1,800–₹4,500to add one point after plastering
₹95k–₹2.1 L2026 full 2BHK electrical scope, ex-GST

Walk the flat with the furniture layout and a roll of masking tape. Mark every point on the wall at its real height. You will move a third of them.

Greenbox principal designer

What the electrical scope costs

Electrical scope costs, Mumbai 2026
ScopeWhat it includesCost, ex-GST
Point addition only, 2BHK18–25 new points, chasing, wiring, plates, making good₹48,000–₹95,000
Full rewire, 2BHKNew conduiting, wiring, DB, RCCB, 55–65 points₹1,35,000–₹2,10,000
Full rewire, 3BHKSame, 75–90 points, 2 DBs₹2,10,000–₹3,40,000
Modular plates upgradeLegrand Myrius or Schneider Livia across the flat₹280–₹650 per point
Smart switchingRetrofit modules on 12–18 circuits₹65,000–₹1,60,000
Earthing pit check and rectificationWhere the building earth is unreliable₹12,000–₹35,000

Add 18% GST. Light fittings, fans and appliances are separate.

Greenbox residential interior project in Mumbai — 1
Greenbox residential interior project in Mumbai — 2
Greenbox residential interior project in Mumbai — 3
Greenbox residential interior project in Mumbai — 4
Greenbox residential interior project in Mumbai — 5

Selected work by Greenbox Design Studio. Tap any image to enlarge.

Frequently asked questions

How many electrical points does a 2BHK need?+

52 to 68 in a properly planned 900 to 1,050 sq ft 2BHK, against the 34 to 42 a builder typically provides. The shortfall is mostly in the kitchen, bedsides and the TV wall. Adding them during first fix costs ₹450 to ₹1,400 a point; adding them after plastering costs ₹1,800 to ₹4,500 and leaves a visible patch.

At what height should kitchen sockets be?+

1050 to 1150 mm from the finished floor — that is 150 to 250 mm above a 900 mm counter. Keep them clear of the backsplash tile joint so the plate sits flat, and off the wall directly behind the hob. Appliance sockets for the oven and microwave go inside the tall unit at the appliance's own height, not at counter level.

Do I need to rewire an old Mumbai flat?+

If the flat is over 25 years old and still on aluminium wiring, a rewire is not optional. Check three things: whether the wiring is aluminium or copper, whether there is an RCCB in the distribution board, and whether the earth reads below 5 ohms. Any one of those failing makes the case. A 2BHK rewire is ₹1,35,000 to ₹2,10,000 ex-GST.

What is an RCCB and do I really need one?+

A residual current circuit breaker trips the supply when it detects earth leakage — typically at 30 mA, well below the level that injures someone. MCBs protect the cable from overload; only the RCCB protects the person. In a home with geysers, a washing machine and an Indian-monsoon damp season, it is the single most important device in the board.

When should the electrical layout be finalised?+

After the furniture layout is frozen and before plastering begins — usually week three or four of a typical home project. Every point position is derived from a piece of furniture: which side the bed head is on, whether the TV is wall-hung, where the study desk lands. Freezing points before the furniture plan guarantees rework.