What sits inside a turnkey contract

Turnkey is a commercial arrangement, not a style of work. The distinction that matters is who carries the risk when two trades disagree on site — under a turnkey contract that is us, and under a piecemeal arrangement it is you:

Turnkey versus appointing trades yourself
Scope itemTurnkey contractDesign-only + own contractor
Drawings and 3DIncludedIncluded
Line-item BOQIncluded, and it is the contractAdvisory only
Material procurementOurs, at trade ratesYours to source and store
Trade coordinationOursYours, in real time, on site
Society / landlord paperworkOursYours
Cost of a clash between tradesAbsorbed by usCharged to you as a variation
Completion dateContractualBest efforts
WarrantySingle point, oursSplit across each vendor

Piecemeal can be cheaper on paper and rarely is by handover. See comparisons for the full argument both ways.

Design and build under one accountable roof — Greenbox Design Studio
Turnkey & Fit-Out

Design and build under one accountable roof

Fit-out categories, plainly

  • Bare shell. Structure, core and nothing else. Everything — flooring, ceilings, HVAC distribution, fire, power, data — is yours to build.
  • Warm shell. The landlord has provided base services to the floor: HVAC to a point, fire mains, power to a panel. You extend and distribute them.
  • Cat A. A finished but generic floor — raised floor, suspended ceiling, lighting, HVAC and fire complete, but no partitions and no identity.
  • Cat B. The fit-out that makes it yours: layout, cabins, meeting rooms, joinery, branding, and the services reworked to suit that layout.

How the money is staged

Milestone payments should track verified progress, not the calendar. This is the structure we use, and it is worth comparing against any other quote you hold:

10%On contract signing
40%On material procurement
40%Against verified site progress
10%After snagging, at handover

The final 10% matters more than the other 90%. A contract with nothing meaningful held back until the snag list is closed gives you no leverage in the last week, which is precisely the week you need it. See snag lists and handover for how we close a project out.

Greenbox commercial interior project in Mumbai — 1
Greenbox commercial interior project in Mumbai — 2
Greenbox commercial interior project in Mumbai — 3
Greenbox commercial interior project in Mumbai — 4
Greenbox commercial interior project in Mumbai — 5

Selected work by Greenbox Design Studio. Tap any image to enlarge.

Related pages

Start your project

Let's design a space worth coming home to.

Free consultation, transparent pricing, and a team that handles design and execution end to end.

📞 CallFree Quote