Free Format

Design approval form, one sheet, fourteen drawings

Drawings are approved as a set, at a revision, on a date. Everything after that is a variation.

4.9/5 · 127 Client ratings
Updated 19 Sep 2026
✓ Warranty-backed work✓ On-time completion guarantee✓ Design & build under one roof✓ 250+ projects delivered

The approval sheet

The full list is below. Read the third column: it is a compact summary of what each drawing is actually responsible for.

Design approval form — 14 drawings
DrawingNumberRevWhat it fixesApproved (Y/N)Date and signature
Furniture layout planGA-01R2Room use, furniture footprint, circulation widths
Demolition and masonry planCV-01R1What is removed, what is built, structural undertaking
Flooring layoutFL-01R1Material per room, tile setting-out, threshold levels
Reflected ceiling planRCP-01R3Ceiling levels, cove positions, fixture locations, AC grilles
Electrical layoutEL-01R2Every socket, switch, light, data and AC point with heights
Plumbing layoutPL-01R1Inlet and outlet positions with heights above floor
Kitchen plan and elevationsKT-01/02R3Unit sizes, appliance cut-outs, counter height, backsplash
Master bedroom elevationsBR-01R2Wardrobe internals, bed panel, bedside, loft
Bedroom 2 elevationsBR-02R1Wardrobe internals, study, loft
Living room elevationsLV-01R2TV unit, back panel, crockery unit, niche lighting
Bathroom elevationsBA-01/02R1Vanity, mirror, shower zone, niche, fittings heights
Door and window scheduleDW-01R1Sizes, swings, hardware, finishes
Material and finish scheduleMS-01R2Brand and code against every surface
3D visualisations3D-01 to 08R2Agreed look; subordinate to the dimensioned drawings

Where a 3D view and a dimensioned drawing disagree, the dimensioned drawing governs. State it on the form.

How to run a design approval

  1. Approve the set, not individual drawings in isolation. A ceiling plan approved without the electrical layout beside it approves nothing.
  2. Record the revision number. 'Approved' with no revision is unusable six weeks later when there have been three more issues.
  3. Walk the electrical layout physically before signing it; it is the drawing with the most consequences and the least visual appeal.
  4. Sign and date on the same sheet. Approvals given in a chat thread do not survive a dispute.

What it prevents

  • A 3D view treated as a dimension. Renders are for agreement on look; they are not measured.
  • Manufacture starting on revision 1 while revision 3 exists. A signed revision number is the only defence.
  • A variation that both sides believe was always included. The approval date draws the line.

Download the form (PDF) →

See how it fits the sequence on the process page, and record changes on the change request form.

Frequently asked questions

How many revisions are normal before approval?+

Two to three on the layout, two on elevations and two or three on the reflected ceiling plan. More than four revisions on one drawing usually means the brief was incomplete rather than the design was poor. A well-filled client brief typically removes one full round.

Do 3D views need to be approved?+

Yes, but with a caveat written on the form: they are approved for look, not for dimension. Renders exaggerate space, shift colour with lighting settings and frequently show furniture that is not in the contract. The dimensioned drawings govern.

Which drawing is most often skipped?+

The material and finish schedule. Everyone approves layouts and elevations and then leaves the finishes to a conversation. A schedule with a brand and code against every surface is what makes the other thirteen drawings buildable to a checkable standard.

What if I want a change after approval?+

That is normal and it is a variation. Raise it on a change request form with the cost and time impact, and both sides sign before the work starts. The approval form is not there to stop changes; it is there so that everyone knows a change has happened.

Can approval be given by email?+

It can, as long as the email names the drawing numbers and revisions being approved. What does not work is 'looks good' against an attachment, six weeks and three revisions ago. The form exists to make the record unambiguous.

Related pages

Start your project

Let's design a space worth coming home to.

Free consultation, transparent pricing, and a team that handles design and execution end to end.

📞 CallFree Quote