Modular Kitchen Designers in Navi Mumbai — Greenbox Design Studio
Navi Mumbai · Kitchens

Modular Kitchen Designers in Navi Mumbai

CIDCO drew a standard kitchen and built it thousands of times. We have measured enough of them to know the shaft position before we walk in.

4.9/5 · 127 Client ratings
Updated 26 Oct 2026
✓ Warranty-backed work✓ On-time completion guarantee✓ Design & build under one roof✓ 250+ projects delivered

The standard kitchen, node by node

Navi Mumbai kitchen rates by node and stock, 2026
Node and stockUsable running feetUtility provision₹ per running foot
CIDCO sector building, older sectors8 – 10 ftDry balcony, sometimes unplumbed₹18,500 – 26,500
1990s sector stock, Sanpada and Juinagar9 – 11 ftPlumbed utility in most plans₹19,500 – 28,000
Vashi and Nerul private towers11 – 14 ftSeparate plumbed utility₹21,500 – 31,000
Seawoods and Palm Beach-side12 – 16 ftUtility plus a service balcony₹23,000 – 34,500
Airoli and Ghansoli newer towers10 – 13 ftPlumbed utility₹20,500 – 30,000

Ex-GST, per running foot of base and wall units. Excludes appliances, sink, tap and chimney.

Wet and dry, properly separated

Households across the nodes cook substantially at home and use the utility or dry balcony as a genuine wet kitchen: the pressure cooker goes there, the grinder goes there, the vessels are washed there, and on occasion the messier frying happens there. Designing as though the main kitchen carries all of it produces a kitchen that is permanently full. What works is a deliberate split — a prep and cook zone with the hob, the counter and the daily storage inside, and a serviced wet zone outside with a deep sink, a drain that actually falls, bulk storage and a vessel rack. Getting the wet zone right is the difference between a kitchen that photographs well and one that stays tidy in year three.

One plan, built a thousand times, measured before we arrive — Greenbox Design Studio
Navi Mumbai · Kitchens

One plan, built a thousand times, measured before we arrive

Worked example: 10 running foot L-shape, Nerul sector building

A 1990s CIDCO flat, fourth floor, lift working. Standard kitchen plan with a window over the sink position and a dry balcony off the far end. Cylinder gas, which the family intends to keep.

Nerul sector kitchen, itemised
Scope₹ lakhNote
Civil work and plumbing0.12Sink line replaced; drain re-fallen to the stack
Base and wall carcass0.68BWP under the sink and in the balcony run, 710-grade elsewhere
Shutters — matt laminate0.45Full overlay, PVC edge-banded, soft-close throughout
Hardware0.32Soft-close hinges and runners; corner carousel; cutlery insert
Granite counter and dado0.28Two-piece counter with the joint under the hob; 600 mm dado
Tall unit with pull-outs0.24Larder beside the fridge; ventilated cylinder cabinet below
Chimney interface0.03Duct connection through the existing sleeve
Loft storage over the kitchen0.03Shallow loft for annual vessels
Total, ex-GST2.15₹21,500 per running foot

Add 18% GST. Excludes appliances and the chimney unit. The two-piece counter is not a compromise here — it is how a slab gets up a CIDCO staircase.

Three things particular to working here

  • Walk-up buildings decide the module sizes. A large part of the older CIDCO stock is ground-plus-four with no lift. Tall units arrive flat-packed and are assembled in the flat, counters arrive as two pieces with the joint designed under the hob or sink, and nothing exceeds about 1,900 mm. It is a design decision, not a delivery-day discovery.
  • Timed water supply changes the testing day. Several sectors are on scheduled supply. New plumbing gets pressure-tested during the supply window, which we book into the programme. Testing from a stored tank tells you almost nothing about how the line behaves at mains pressure.
  • Creek-facing kitchens are a different specification. On the Palm Beach, Seawoods and Airoli creek frontages the utility run and any exposed metal need SS 316 and marine ply. In Vashi sector 17 or Kopar Khairane, four kilometres inland, that is a markup with no benefit and we do not specify it.

What we would spend the last fifty thousand on

On a kitchen in this band, the marginal fifty thousand rupees does most good inside the cabinets rather than on their faces. In order: proper drawer hardware on the two base units nearest the hob, because those open twenty times a day; a full-height larder pull-out instead of shelves, which converts dead depth into usable front-facing storage; a deep single-bowl sink rather than a double, which is the single most-used item in the room; and under-cabinet lighting on its own switch. What it should not go on is a shutter finish upgrade or a decorative backsplash — both are visible and neither changes how the kitchen works.

On programme, a kitchen-only project here runs about three weeks from final measurement: a week in the factory, three days for carcass installation, five days while the counter is templated from the installed carcass and cut, then shutters, hardware and appliances. We do not template a counter from a drawing, because a millimetre of variation in a sector flat's wall is normal and a counter cut to the drawing arrives with a visible gap at the back.

₹18,500Entry rate per running foot
8–11 ftStandard CIDCO kitchen
1,900 mmWalk-up module limit
3 wksKitchen-only programme

For the region node by node, see interior designers in Navi Mumbai. For our kitchen specification, hardware and warranty, see modular kitchen designers in Mumbai.

Navi Mumbai modular kitchen
Navi Mumbai living and dining
Navi Mumbai bedroom
Navi Mumbai apartment interior
Navi Mumbai bedroom and study

Kitchen work by Greenbox Design Studio.

Frequently asked questions

Do you already know my kitchen's dimensions?+

Often, yes. CIDCO built its sector flats to standard plans and we hold verified measured drawings for several of them, including shaft and window positions. We still measure on site, because previous owners move sinks and close balconies, but the survey is short and the quotation can be fixed rather than estimated.

My building has no lift. Can I still have a granite counter?+

Yes, in two pieces with the joint designed to land under the hob or the sink where it is invisible. A full-length slab will not clear a CIDCO half-landing. The joint is not a compromise in quality — it is planned into the stone order and cut in the yard rather than improvised on site.

Should the washing machine go in the kitchen or the balcony?+

The balcony, every time, if it is plumbed. It removes the noise, the vibration and the wet work from the cooking space and frees a full base unit. Specify the balcony run in BWP or marine ply with sealed edges, because it is a semi-exterior position and MR board will not survive there.

Why is a Navi Mumbai kitchen cheaper than one in Chembur?+

Repeat layouts cut the design and variation allowance, site access is easy so handling costs less, and the local trade prices below the island city. Around 12–15% at the same specification. The ply, the hardware brands and the finishes are exactly what we would use in a Worli kitchen.

Is a chimney worth it if we cook Indian food daily?+

Yes, and the sizing matters more than the brand. For heavy daily cooking specify a suction rating matched to the hob width with the duct run kept short and straight to the existing sleeve. A long duct with two bends halves the effective extraction, which is why an expensive chimney sometimes performs worse than a cheap one.