The four questions a visitor has
Everything in a reception exists to answer four questions quickly: where do I go, who do I speak to, where do I wait, and how do I get through the door. A reception that answers all four without anyone having to ask is doing its job, whatever it is finished in. A marble-clad lobby where a visitor stands still for twenty seconds looking for a person is not.
The most common failure is the sightline. A visitor stepping out of the lift should see the reception desk, or a clear directional cue to it, within the first two metres. Where the lift lobby opens onto a blank wall or a planter, add a lit logo wall with a directional arrow — it is a ₹40,000 fix for a problem that otherwise costs every visitor twenty seconds of mild confusion.
Sizing the space
| Office size | Peak concurrent visitors | Reception area | Seats | Typical spend |
|---|---|---|---|---|
| Under 30 staff | 1–2 | 90–150 sq ft | 2–4 | ₹4–₹9 lakh |
| 30–80 staff | 2–4 | 150–300 sq ft | 4–6 | ₹9–₹22 lakh |
| 80–200 staff | 4–8 | 300–600 sq ft | 6–10 | ₹22–₹48 lakh |
| 200–500 staff | 8–15 | 600–1,100 sq ft | 10–18 | ₹48–₹95 lakh |
| Client-facing / consulting | Add 50% | Add 50% | Add 50% | Add 40–60% |
Peak concurrent visitors, not daily footfall, is the number that sizes the space. Ask the facilities team for a week of visitor-log data.
The desk, in millimetres
A reception desk is two workstations in one object and it is almost always detailed as furniture rather than as a workplace. The visitor-facing counter sits at 1,050 mm — standing height — and needs 400–500 mm of usable depth for a visitor to sign, place a bag or handle a pass. Behind it, the receptionist's work surface is at 720 mm with proper knee clearance, a monitor at correct viewing height, and cable management that is not visible from the front.
- Include an accessible section at 760–800 mm with knee clearance below, at least 900 mm wide, for wheelchair users. This is a code requirement in most new Indian commercial buildings and it is routinely missed.
- Plan the monitor position. A screen visible from the visitor side is a data-protection problem, and a screen that forces the receptionist to turn away from arrivals is a service problem.
- Storage for deliveries. Every reception receives couriers. Without a designated cupboard, parcels stack on the floor beside a ₹9,500 per sq ft finish.
- Power and data at the counter, including a visitor-side socket. Visitors will charge phones whether or not you provide it.
- A place for the receptionist's own things. Bag, water bottle, jacket. Its absence is why those items end up on the counter.
- Acoustic separation. The reception conversation should not be audible in the waiting seats, which are often 2 m away. A partial screen or an absorptive backdrop helps.
Flow and access control
The security line is where reception design most often breaks down. Staff arriving want to badge through quickly at 9:30 am; visitors want to register; couriers want to hand over and leave. If all three queue at the same point, the morning peak produces a jam directly in front of the visitor seating, which is the worst possible first impression.
- Separate the staff badge line from the visitor desk, ideally on the opposite side of the lobby, so the two flows never cross.
- Put the courier drop-off before the security line, with a shelf and a bell. Couriers should never need to enter the secured floor.
- Allow 1,500 mm clear in front of the turnstile or door for queueing without blocking circulation.
- Position seating out of the through-route. A waiting visitor should not be in the path of every person walking to the lift.
- Give the receptionist a sightline to the entry and to the turnstile. If they cannot see both, tailgating goes unnoticed and arriving visitors stand unacknowledged.
- Plan for the second receptionist. Even where only one is employed, peak periods and leave cover need a second position; retrofitting it into a sculptural desk is impossible.
Materials and what survives
Reception is the highest-traffic 300 square feet in an office and it is usually finished in the least durable materials, because it is the area chosen for visual impact. Three details fail first: the desk's front edge, where trolley wheels and bag corners strike it; the floor immediately inside the entrance, which takes the grit; and the wall at 900 mm beside the seating, where people lean.
Specify a hard-wearing edge to the desk — solid surface, stone or metal, not laminate on a square edge. Use an entrance matting well of at least 2 m in the direction of travel, which removes the majority of tracked-in grit and is the single most effective floor-protection measure available. And keep the wall finish behind the seating wipeable, or accept repainting it annually.
Signage, branding and the things nobody budgets
Three items are consistently left out of reception budgets and then added in a hurry at the end, usually badly. The first is the logo and its lighting: a backlit or halo-lit logo wall is a ₹60,000–₹3,50,000 item depending on scale and material, it needs a power point in exactly the right place, and it needs to be resolved at the electrical drawing stage or the cable emerges from the wrong side of the wall. The second is wayfinding — the directional signage that tells a visitor which way the meeting rooms are — which is a designed system, not a set of printed sheets, and costs ₹40,000–₹2,00,000 across a floor.
The third is the visitor management system. A tablet on a stand, a printer for badges, a power and data point for each, and space on the counter for the whole assembly. It looks trivial on a drawing and it is the thing that ends up taped to a beautiful stone counter with a visible cable, because nobody allocated 400 mm of surface and a socket to it. Ask the IT team what system they intend to use before the desk is drawn, not after it is fabricated.

Reception planned around the first sixty seconds





Selected work by Greenbox Design Studio. Tap any image to enlarge.
Frequently asked questions
How big should an office reception be?+
Size it from peak concurrent visitors at 0.9–1.4 sq m each, not as a percentage of the floor plate. For a 30–80 person office that is typically 150–300 sq ft with four to six seats. A week of visitor-log data from the facilities team gives you the number in ten minutes.
What height should a reception desk be?+
1,050 mm for the visitor-facing standing counter, with 400–500 mm of usable depth, and 720 mm for the receptionist's work surface behind it. Include an accessible section at 760–800 mm with knee clearance below, at least 900 mm wide — a code requirement that is often missed.
How many seats does a reception need?+
Four to six for most offices of 30–80 people, scaling to ten or more above 200 staff. If you need more than that, the underlying problem is usually meeting scheduling rather than reception size — visitors are arriving before hosts are ready for them.
Where should access control sit?+
On a separate line from the visitor desk, with 1,500 mm of clear queueing space in front, and positioned so the receptionist has a sightline to it. Staff badging in at the morning peak should never queue through the visitor waiting area, which is the commonest planning fault in Indian office receptions.
What does a reception fit-out cost?+
₹3,200–₹9,500 per sq ft in Indian metros in 2026, which puts a 250 sq ft reception at ₹8–₹24 lakh ex-GST depending on the finish level. The desk alone is typically ₹2.5–₹8 lakh as a bespoke piece in solid surface or stone with integrated services.
Does the reception need its own acoustic treatment?+
Yes. It is usually a hard-finished space next to a lift lobby, and conversations at the desk are audible to waiting visitors two metres away. An absorptive ceiling, a treated backdrop wall or a partial screen between the desk and the seating solves it, and costs a fraction of the finishes around it.